Conductor & interface
Cable material and size · equipment terminal material
Серия медно-алюминиевых кабельных наконечников. Варианты подключения DTL, DTLZ и CPTAU.

| Конструкция | Фокус выбора | Ссылка на серию |
|---|---|---|
| Copper–aluminium terminals | Check conductor compatibility, palm dimensions and the series drawing. | DTL-1 · DTL-2 · DTL-2-F |
| Small-head terminals | Compare the mounting footprint with the available equipment space. | DTLZ |
| Pre-insulated terminals | Confirm conductor range, insulation specification and installation method. | CPTAU |
Check the series drawing against your cable and installation requirements.
Cable material and size · equipment terminal material
Palm size · stud hole · barrel dimensions · installation clearance
Bare or pre-insulated series · required insulation properties
Approved installation method · environment · supporting test records
Отправьте точную модель, детали проводника, монтажный чертеж и количество заказа.
Подготовьте запросСогласуйте спецификацию и необходимые доказательства перед размещением заказа.
Изучите производствоConductor size, mounting dimensions and the model-specific drawing.
Укажите совместимость с проводником, основной материал и покрытие поверхности.
Share your identification, branding and traceability requirements.
Provide pack quantities, label details and shipment requirements.

OEM & PACKING
Build your bimetallic cable lugs order around the selected models, identification and supply requirements.
Conductor size, mounting dimensions and the model-specific drawing.
Provide part numbers, label artwork and any batch or traceability information required for the order.
Specify quantities per model, individual packs, outer cartons and delivery destination.
It may be specified when the conductor and equipment contact use different metals. Confirm the intended conductor and palm materials, dimensions and assembly instructions for the exact model.
No. Review conductor preparation, connection geometry, insulation construction and the required installation method separately for each series.
Send the exact model, conductor details, installation drawing and order quantity. Include the exact model quantities, delivery destination and required documentation.
Send your part numbers, label artwork, pack quantities and shipment requirements. Feasibility, sample requirements, minimum quantities and lead time are confirmed for the requested models.