Cable ends
Material and cross-section at each end · conductor construction
Copper, aluminium and bimetallic connecting sleeves. Compression, pre-insulated and shear-bolt series.










| Construcción | Enfoque de selección | Referencia de serie |
|---|---|---|
| Copper sleeves | Compare through-type and oil-blocking configurations by model. | GT-1 · GT-2 · GTY |
| Aluminium sleeves | Match conductor size and the sleeve drawing. | GL-1 · GL-2 · GLB |
| Bimetallic sleeves | Specify the conductor material and size at both ends. | GTL |
| Insulated & mechanical joints | Confirm insulation requirements or shear-bolt conductor compatibility. | MJPT · AMB |
Check the series drawing against your cable and installation requirements.
Material and cross-section at each end · conductor construction
Compression sleeve or mechanical shear-bolt connector
Through-type or oil-blocking · bore dimensions · overall length
Insulation requirements · joint system · tool and installation instructions
Send the exact model, conductor details, installation drawing and order quantity.
Prepare an enquiryAgree the specification and required evidence before placing your order.
Explore manufacturingConductor sizes at both ends, sleeve length and bore dimensions.
Specify conductor compatibility, base material and surface finish.
Share your identification, branding and traceability requirements.
Provide pack quantities, label details and shipment requirements.

OEM & PACKING
Build your cable splice connectors order around the selected models, identification and supply requirements.
Conductor sizes at both ends, sleeve length and bore dimensions.
Provide part numbers, label artwork and any batch or traceability information required for the order.
Specify quantities per model, individual packs, outer cartons and delivery destination.
Specify both conductors: material, cross-section and construction. Match the sleeve to that conductor pair, then confirm preparation, tooling and any insulation or sealing requirements.
Do not assume this is suitable. Review a documented mixed-material connector and its installation requirements for the proposed conductor pair.
Send the exact model, conductor details, installation drawing and order quantity. Include the exact model quantities, delivery destination and required documentation.
Send your part numbers, label artwork, pack quantities and shipment requirements. Feasibility, sample requirements, minimum quantities and lead time are confirmed for the requested models.