Cable ends
Material and cross-section at each end · conductor construction
Luvas de ligação em cobre, alumínio e bimetálicas. Séries de compressão, pré-isoladas e de parafuso de corte.










| Construção | Foco na seleção | Referência da série |
|---|---|---|
| Copper sleeves | Compare through-type and oil-blocking configurations by model. | GT-1 · GT-2 · GTY |
| Aluminium sleeves | Match conductor size and the sleeve drawing. | GL-1 · GL-2 · GLB |
| Bimetallic sleeves | Specify the conductor material and size at both ends. | GTL |
| Insulated & mechanical joints | Confirm insulation requirements or shear-bolt conductor compatibility. | MJPT · AMB |
Check the series drawing against your cable and installation requirements.
Material and cross-section at each end · conductor construction
Compression sleeve or mechanical shear-bolt connector
Through-type or oil-blocking · bore dimensions · overall length
Insulation requirements · joint system · tool and installation instructions
Envie o modelo exato, detalhes do condutor, desenho de instalação e quantidade da encomenda.
Prepare um pedido de consultaAcorde a especificação e as provas necessárias antes de efetuar a sua encomenda.
Explorar fabricoConductor sizes at both ends, sleeve length and bore dimensions.
Especifique a compatibilidade do condutor, o material base e o acabamento superficial.
Partilhe os seus requisitos de identificação, marca e rastreabilidade.
Provide pack quantities, label details and shipment requirements.

OEM & PACKING
Build your cable splice connectors order around the selected models, identification and supply requirements.
Conductor sizes at both ends, sleeve length and bore dimensions.
Provide part numbers, label artwork and any batch or traceability information required for the order.
Specify quantities per model, individual packs, outer cartons and delivery destination.
Specify both conductors: material, cross-section and construction. Match the sleeve to that conductor pair, then confirm preparation, tooling and any insulation or sealing requirements.
Do not assume this is suitable. Review a documented mixed-material connector and its installation requirements for the proposed conductor pair.
Send the exact model, conductor details, installation drawing and order quantity. Include the exact model quantities, delivery destination and required documentation.
Send your part numbers, label artwork, pack quantities and shipment requirements. Feasibility, sample requirements, minimum quantities and lead time are confirmed for the requested models.